Hi,
Thanks for the input.The missing link was instead of creating 3 sampling scheme i have assigned the balance 2 in the same scheme.
Now where to assign the sampling scheme in quality plan?If yes then i have to create one dummy MIC & then assign the sampling scheme am i right?