Hi Suresh,
Thanks.I will check out in details.
But let's say I have a raw material ( SAP code: 1111) sourced from US, and as well from Brazil. I will produce a finish good with either raw material from Brazil or from US. My customer is asking for raw material from Brazil only, Will I with this configuration be able to select Brazilian raw material when starting the production ( with material code 1111)?
With this type of configuration, will it be easy to manage inventory?
I am not too technical sorry for this !
Thank you.