Hi there,

 

we are working with the ChaRM 7.1 processes (SP12). Change Request, Normal Change, Urgent Change are copies of SAP-Standard.

 

With 7.1 SAP introduced the possibility to connect more than one change document to one change request. We are using this feature. Now, when one of the connected changes is imported into production, the status of the change request is set to "implemented" regardless of what status the other connected changes have. This is - to our understanding - not correct. The status of CR should remain "being implemented" as long as at least one is not yet imported into production. Or with other words, the last change document receiving the status "imported into PROD" is allowed to change the status of the CR (last one shuts down the lights).

 

Is there any way to achieve this with SAP standard? The consistency check "PREDOC_CAN_BE_SET" is not doing this.

 

Thank you for your help.

 

Michael