Hi Achim,
Appreciate your response.
The solution which you have suggested is very logical but there must be a way for doing this as SAP has suggested to add the scope dimension manually after migration.
Regarding the journals, We have more than 2000 journals posted in old system. To post the same journal in new system, will take a lot of time.
Regards,
Rahul Periwal