Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8944

Re: ABOUT AVAILABLE CHECK

$
0
0

Hi, dear Neeraj,

 

I checked  MRP TYPE in material master of T-AT101, which is PD,

along with the item category TAN, I can determine the requirement type is 41.

so as to the requirement class is 41.  the availability switch is on.

 

I checked CHECKING GROUP in material master of T-AT101, whick is 01,

 

 

the schedule line category is CP, I disabled the available check in CP for test.

 

the problem is : I create two kinds of orders with   same customer, same material, same item category, and  same schedule line category.

when I create a OR,  I can not take availability check in the order processing.

but when I create a CS, I can still take availability check

It is unreasonable...

 

 

Thanks.

 

Michael.


Viewing all articles
Browse latest Browse all 8944

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>