Hi All,
Calender week is with selection option in the variable of Bex report.Ex: User can enter two calender weeks.
In the out put we will get two columns( Calender weeks ) with respect to the key figure.
Is there any way i can get the dynamic variance calculation in the report between two Calender weeks as a extra column.
Thanks,
Ramnaresh