Hi Experts,
I came across an issue in the operation subcontracting PR.
We have a production order with 100 EA which is having its 3rd operation as external operation and subcontracting PR got created for 100 EA once I released my prod order.
I actually scrapped 10 EA in the second operation and physically I am sending only 90 EA to the vendor. The problem here is that the subcontracting PR is not editable and shows only 100 EA even though is scrapped 10 in the earlier operation.
I am aware that the production order quantity changes will be copied to the PR automatically, but I need a better solution for mapping this scrap scenario.
Expecting a early response.
Regards,
Krishna Chandra