Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8944

Re: QM Certification Issue during GR

$
0
0

Hi Parth,

 

Check the following IMG activity path

IMG
>Quality Management
>>QM in Logistics
>>>QM in Procurement
>>>>Define Keys for Certificate Processing

Define Certificate Types

Control without certif.

e.g.:  'Without lot: Blocked stock'

F1 Help:

"Control if Certificate Is Not Available

Type of control used by the system if the certificate required at goods
receipt is not provided. The deciding factor is whether or not an
inspection lot is created at goods receipt.

The system allows for the following cases:

- With lot: Status in inspection lot      Without lot: Blocked stock

- With lot: Status in inspection lot      Without lot: Error message

- With lot: Error message                 Without lot: Blocked stock

- With lot: Error message                 Without lot: Error message

- With lot: Status, no skip-to-stock      Without lot: Blocked stock

- With lot: Status, no skip-to-stock      Without lot: Error message

- Warning

- Information

Dependencies

If you set the indicator Inspection lot for several material items in the material master,
in certain circumstances the system does not create an inspection lot when a partial or
follow-up delivery is received. As a result, the system sends an error message.

 

Regards,

Natália


Viewing all articles
Browse latest Browse all 8944

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>