Re: How to map revision level materials to already created inspection plan?

$
0
0

Hi Naresh,

 

Each raw material is having different revision level, so i dont think creating one inspection plan will solve this issue.

You will have to create different inspection plans for each Revision level.

 

Question is do we have common revision level ? may be not, please check.

 

I have not worked on Revision levels before but my approach would be

 

1. Check how many revision levels are there (AEOI Table) Put AETYP = 41 and enter Material code in field "OBJEKT".

2. Bifurcate Materials as per their revision levels.

3. Create inspection plan for each revision level and assign particular Materials to these plans.

 

Amol.